Work has recently completed on a first phase of major riversides regeneration scheme in Portadown. We were awarded the project to deliver a range of environmental improvements on behalf of clients Armagh, Banbridge and Craigavon Borough Council working alongside Managing Consultants RPS Group.

Project works which were carried out between the Old Town Quay and the Pump House included resurfacing, lighting, together with the installation of street furniture an enhanced fencing around the boundary of Haldane Fisher. Works also included paving and surfacing around the busy Pump House coffee shop. Council representatives have indicated that further works are proposed as part of wider future for the area.

The quality of workmanship was excellent with a collaborative approach to project delivery. The client Armagh, Craigavon & Banbridge Council was thoroughly satisfied with the standard of work and overall scheme.
William O'Donnell, Consultant Engineer, RPS Group